Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
      • Neutrons: The Science of Everyday Life
    • ESS Organisation
      • Governance
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
      • Upcoming Events
    • Publications
    • Legal & IP
      • ESS Privacy and Cookies Policies
    • Contact ESS
      • Tours & Visits
      • How to Find Us
      • Interactive Map
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
    • Instruments
    • Instrument Technologies
      • Chopper Systems
        • Choppers Research & Development
      • Detector Systems
        • Detectors Research & Development
      • Motion Control & Automation
      • Neutron Optics & Shielding
    • Data Management & Software Centre
      • Computing Centre
    • Science Support Systems
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
      • SCUO
    • Workshops & Facilities
  • Technology
    • Technical Management
    • Accelerator
      • How It Works
      • Beam Physics, Operation & Beam Diagnostics
      • Specialized Technical Services
      • Radio Frequency Systems
      • LINAC
      • Engineering Resources & Safety
    • Target
      • How It Works
    • Controls
  • Building ESS
    • Partnerships & Collaborations
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Site Weekly Updates
    • Aerial Views
    • Webcams
  • Partners & Industry
    • In-Kind Contributions
    • Procurement
      • Procurement Listings
      • Contract Award Notices
    • Industrial Suppliers
    • Grants & Events
      • Grants
      • Events
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal & IP Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Instrument Technologies Data Management & Software Centre Science Support Systems Workshops & Facilities
  • Technology
    Technical Management Accelerator Target Controls
  • Building ESS
    Partnerships & Collaborations The Building Project Site Weekly Updates Aerial Views Webcams
  • Partners & Industry
    In-Kind Contributions Procurement Industrial Suppliers Grants & Events
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Contact
  • Press
  • Privacy
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal & IP
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    detector aquarium ess
    Instrument Technologies
    dmsc
    Data Management & Software Centre
    sss magnet
    Science Support Systems
    linkoping detector coatings workshop ess
    Workshops & Facilities
  • Technology
    irfu cea ess accelerator
    Technical Management
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Partners & Collaborations
    Partnerships & Collaborations
    Building project
    The Building Project
    weekly construction updates
    Site Weekly Updates
    ess aerial snow
    Aerial Views
    Webcams
    Webcams
  • Partners & Industry
    tartu pump probe
    In-Kind Contributions
    procurement
    Procurement
    ess target twister shaft
    Industrial Suppliers
    partner day
    Grants & Events
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

June 2019

Target

Casting work included the vault for the small house and the high L-shaped wall for the big house on top of the Monolith high bay slab, walls for stair towers/lift shafts in laboratory 1A and in the Transport Hall, two further base slabs for the Experimental Hall, the vault for the Utility high bay, the first part of the Active Cell high bay vault, and walls for the Utility elevator shaft on top of the vault: this shaft goes all the way down to basement level.
Walls and slabs for the Transport Hall also progressed, as well as bottom slabs for Experimental Halls 1 and 3. Full height walls in the Technical Gallery surrounding Active Cell in a u-shape, are still ongoing; the high bay vault will follow.
Target Division was granted parallel access to the Monolith area to perform time-critical works in the heart of the facility. The scope included:
  *  Base plate, vessel support and ground shielding in the Monolith puck area
  *  Shielding and pipe support in the 'Drift to Target' (D2T)

A mobile crane has been placed on the south side of the Monolith Building to lift in the equipment.
The centre pillar and support ring for the target vessel support have been installed, and will be followed by 24 wedges of ground shielding, to be placed inside the puck in three layers. The Monolith vessel, containing the tungsten bricks, is scheduled for delivery to site in January 2020. This is a major in-kind contribution from ESS Bilbao (Spain). It will come in two pieces weighting approx. 40 tonnes each.
Stakeholder works have started in the heart of the facility - part of the steel tower and scaffolding has been dismantled exposing the Monolith's extraordinary round shape. Inside the Monolith, steel blocks for aligning the base plate are being positioned.
A lot of radiation shielding is required inside the proton beam drift room, hence all the steel plates being installed. The support structure for the beam pipe in 'Drift to Target' is in place. A concrete plug and concrete lids for the Target's concrete area will be cast later this year.
Work will start on superstructure erection in several buildings on site; Admin (the back entrance to the Target Building), the laboratory building to Experimental Hall 2, and Monolith/Utility will all be equipped with steel columns starting in July. At the same time, Lambda will finish the last few slabs for Experimental Halls 1 and 2. 

Accelerator

On 12 June the Medium Energy Beam Transport (MEBT) was delivered from Spanish in-kind partner ESS Bilbao: another major component for the Accelerator Tunnel, comprising 19 packages. Mounting will be performed on site by a team from ESS Bilbao, supported by the Linac Group of the ESS Accelerator Division. The RFQ will be delivered after the summer, and will be fitted between the LEBT (Low-Energy Beam Transport) and the MEBT.
Nine valve boxes are now in place for the Cryogenic Distribution System, with another six units being delivered to site shortly. Installation of waveguides was completed in the medium beta part of the Accelerator tunnel; valve boxes for the Cryogenic Distribution System (CDS) will follow the waveguides.

General

Central Utility Building: The floors inside the building were completed. Slab castings in the process hall approached completion. Gypsum and painting work to start in the rear substation area.
Gallery Buildings: Grinding and dust binding in the G01 emergency exits were carried out. IFJ PAN continue with installation in the high beta Linac.
Experimental Halls: Epoxy floors were poured for the E03 laboratory building. Installation of lightning protection for Experiment Hall 1 began.
Civil Works: Asphalt is now in place outside the Substations to the Target and Experimental Halls 1 & 2.
Campus Project: Concrete prefab erection has now started for the B01 office building. A crane has been placed on the Campus worksite to facilitate these works.

Upcoming handovers to ESS
  *  13 August: Logistics Centre - early access in July, for storage purposes.
  *  15 August: Experiment Hall 3)  part 1 of the Beamline Gallery, the Substation Building to Experiment Hall 3.
  *   Two Laboratory Buildings are due to be handed over in December.